Reconstruction of the Ziegeleipark in Heilbronn - Böckingen, Germany
The artificial lake was first built the conventional way. The lake was never filled, because the water seeped faster then the relatively slow flowing water from the stream. The reconstruction with the CONSOLID SYSTEM was a full success. Since then, the lake was always full. Today all kind of aquatic plants, fishes, frogs, etc growing in the lake.
This shows that the CONSOLID SYSTEM is an environment friendly product. The reconstruction costs with the CONSOLID SYSTEM were only 20% comparing with the previous cost of the conventional way.
 |
|
Â
|
|
1996 Wildhaus, Switzerland
A water pound for the production of artificial snow.
The artificially built lake behind a soil dam was lined with pre-treated soil, mixed with Consolid + Solidry, of high density, indicating full impermeability.

|
|
Â
|
|
1997 Davos, Switzerland
A public recreations area at 1600 m above sea level
The artificially built lake was lined with local treated soil, mixed with Consolid + Solidry. The lake is 3 m deep with a children area, which is maximum 30 cm deep. Â
The environmental friendly CONSOLID SYSTEM does not harm the sensible alpine ecological system.

|
|
Â
|
|
1996 Waste Disposal Site Extension
Budapest, Hungary
The total extension will be built over several years to more than 400.000 m2.
The Consolid System has been used in recent years to build over 12 disposal areas all over the country after it has shown excellent performance in achieving impermeability with in suit soil.

| | |
|
|