Sunday, 5 September 2010
Customer Service
Email: info@consolid.co.uk


Pre-treatment of any soil mix 'in plant' allows timely unlimited stockpiling of pre-treated material without any loss of effectiveness.

The CONSOLID SYSTEM offers two ways to be used on site:

'in place', with the in-situ soil, using a soil mixer for the application of the additives; and

'in plant', using any stationary mixer to pre-treat the in-situ soil or soil mixes and stockpile the material until weather conditions or the site allow to use it, simply by placing, leveling and compacting, and saving in this way a lot of the time on the site - thus prolonging the actual construction season in the field.

'in place'



'in plant'

 

One of the great advantages of the CONSOLID SYSTEM is the possibility of pre-mixing any in-situ soil or soil mix, stockpiling the treated material for unlimited time and still having the full effectiveness.

  • Pre-mixing allows the bad weather periods to carry out jobs which otherwise could not be done, saving time in this way;
  • In quarries and gravel pits it becomes possible in this way to compose by using any waste material proper soil mixes which, if treated, will always have the same quality parameters in respect of C.B.R., E-modules or any other specification required. This offers a new range of ready-to-use products for the construction industry;
  • The specific character of the CONSOLID SYSTEM will allow in this way to recycle and upgrade waste material which otherwise would need costly steps in disposing them, e.g. polluted material from road rehabilitation or the rehabilitation of railway tracks. Due to the fact that polluting ingrediants can be immobilised by making the treated material impervious, it becomes possible to use such waste without the danger of harmful leakage.
  • In this manner you can easily conform to the rules of "Performance-based Specification"
<<< back
^ Return to Top